Plant Ops to shut down some power, connect Lot V

A planned electrical shutdown tonight at midnight will include several campus buildings. The outage is planned to last 30 minutes and is needed to connect the solar panels at Lot V into the campus electrical system. Buildings to be affected include:

Smittcamp Alumni House
Education Building
Satellite Student Union
Downing Planetarium
Planetarium Museum
Industrial Technology
Science II
Plant Operations

For further information, contact Plant Operations at 278-2373.

Previous Story

On the road to Reno

Next Story

VIDEO: Oct. 8, 2007: Political journalist Dan Walters